Why RPS
Build sooner.
Build sure.
Taking the engineered pad off the job changes three things about a foundation.
-
Speed
The foundation comes off the critical path weeks sooner, and every trade behind it starts sooner.
How it works -
Predictability
The engineered pad, and its unknown cost, can drop out. A fixed four-box module means counts and crews are set before anyone mobilizes.
Cost & schedule data -
Performance
A stiff, two-way ribbed raft built with standard rebar or post-tension reinforcing, designed to span expansive clay and other problem soils.
Product specs
The difference is the pad.
Traditional Slab on an engineered pad
7.5weeks
RPS Raft on prepared grade
4weeks
The two-week pad drops out* and the slab goes in one monolithic pour: 3.5 weeks back on the critical path, and every trade after it starts sooner.
*In qualifying applications. Illustrative RPS model figures for a representative 20,000 SF building; actual cost and schedule vary by project, region, soil, design and crew. Foundations are designed by the project's Engineer of Record.
Download the one-pagerTraditional Slab on an engineered pad
$18–21/SF
RPS Raft on prepared grade
$18/SF
The pad drops out*, and with it the biggest unknown in the budget. A fixed $18/SF, or $360K on a 20,000 SF building.
*In qualifying applications. Illustrative RPS model figures for a representative 20,000 SF building; actual cost and schedule vary by project, region, soil, design and crew. Foundations are designed by the project's Engineer of Record.
Download the one-pagerHow it works
How it goes
together.
Four repeatable steps on a level subgrade. One pour. No separate footing pours.
Set the forms
VBox units go down on the prepared grade in four-box modules, ribs on five-foot centers. Beam lines stay clear.
Beams and edges
Perimeter and interior beams form up as they normally would, full depth and full width at the form face.
Connect and reinforce
Bottom connectors lock the module and seat the lower mat on the rib lines. Top connectors carry the upper mat.
Pour
Concrete fills the ribs, beams and 4-inch top slab in one pour. The forms stay in place.
Who it's for
Built for the
whole project team.
-
Developers
Replace an open-ended soil expense with a predictable foundation cost and a foundation schedule cut from 7.5 weeks to 4. Applications -
Engineers of Record
Design with the ACI and post-tensioned methodology you already use: no new design pathway. Rebar or post-tension, on expansive, compressible or rocky soils. Engineering resources -
Contractors
VBox units set directly on a level subgrade in four-box modules on a fixed grid, and are strong enough for crews to walk on during installation. Installation
Built to resist cracking.
The forms shape concrete into a dense network of ribs, arches and beams. The raft spreads load across the slab and resists settlement and shrinkage cracking.
- 2–3× Control joint spacing
- Joints can sit two to three times farther apart than a conventional slab on grade.
- 4+ mi Joints eliminated
- On one data center design, cutting install cost and ongoing maintenance.
RPS VBox specifications
One footprint.
Two standard heights.
RPS VBox units go down in four-box modules, 60 inches square, with ribs on five-foot centers. Connectors lock each module and seat the reinforcing. Each unit is strong enough for crews to walk on, unaffected by water, and easily cut for utility penetrations. Compatible with both rebar and post-tensioned designs.
| Specification | 10″ | 14″ |
|---|---|---|
| Height | 10″ | 14″ |
| Weight | 6.45 lb | 7.30 lb |
| Quantity per pallet | 137 | 133 |
| Footprint | 30″ × 30″ | |
| Module | Four VBox units, 60″ square | |
| Rib spacing | 5 ft on center | |
| Reinforcing | Rebar or post-tension | |
| Material | Recycled polypropylene | |
Send us
the plan.
Tell us about your project and we'll show you how RPS fits it. Send your plans, PDF or CAD, with the project location, soil information and target schedule.
Request project pricingSite-specific foundation design by the project's Engineer of Record.