Technical briefs.
- One-pager
Cost and schedule comparison
Traditional vs RPS for a representative 20,000 SF building: $18 vs $18–21 per square foot installed, 4 vs 7.5 weeks foundation to slab.
V2, 11.23.26 · 1 page · PDF, 56 KB - System overview
RPS VBox system overview
Four pages for the Engineer of Record: how the two-way ribbed slab goes together, rebar or post-tension, and the specifications.
V11 · 4 pages · PDF, 1.0 MB - Technical brief
Eliminating presoak on expansive soils
No presoaking required. Almost 9,000 gallons of presoak water avoided on a 1,500 SF home.
Jim Winslow · V2, 11.23.26 · 2 pages · PDF, 86 KB
Datasheets.
One sheet per form height, with dimensions, weight and pallet counts.
-
10″ VBox datasheet
6.45 lb · 137 per pallet · PDF
-
14″ VBox datasheet
7.30 lb · 133 per pallet · PDF
LEED potential.
RPS may contribute in four LEED areas. Eligibility and available credits are evaluated for each project.
- Innovation and Design
- Materials and Resources
- Water Efficiency
- Energy and Atmosphere
- VBox units made from recycled polypropylene.
- No presoaking, so less water.
Need more
detail?
Send us your plans, PDF or CAD, with the project location, soil information and target schedule, and we'll share what fits the project.
Request project pricingSite-specific foundation design by the project's Engineer of Record.